-- card: 101486 from stack: in -- bmap block id: 80488 -- flags: 0000 -- background id: 3633 -- name: With Actual Dates 2 -- part 34 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 35 (field) -- low flags: 01 -- high flags: 2000 -- rect: left=291 top=148 right=191 bottom=445 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 9 -- style flags: 0 -- line height: 12 -- part name: -- part contents for background part 6 ----- text ----- Slack time is calculated as the difference between the Latest Start date and the Actual Start date and is shown as a shaded extension to the actual bars in the timelines. (In the Task Timeline, the slack applies to the task itself; in the Resource Timeline, the slack is for the resource’s work on the task.) When using actual dates, MacProject II calculates a resource’s allocations from the Actual Start dates of tasks to which the resource is assigned. -- part contents for background part 27 ----- text ----- Recalculating the Schedule -- part contents for background part 28 ----- text ----- With Actual Dates -- part contents for card part 34 ----- text ----- 2 of 2 -- part contents for card part 35 ----- text ----- Slack time projected for this task based on any actual dates you have provided.